The Project consists of a rock fill dam with 174.5m height and concrete-covered front face and a hydroelectric power plant. Yüksel scope of works include the construction of the dam body, downstream and upstream cofferdams, power and derivation tunnels, spillway and injection works. The dam access road, temporary downstream bridge, other bridges as required by the project, and material transport roads are also included in the scope. In addition, expropriation maps of dam and facilities and any and all kinds of road and reservoir areas are among the works that Yüksel has undertaken.
Location Diyarbakır / Türkiye