Industrial Projects
Yüksel, has signed numerous of contracts to undertake several water transmission lines, sewage and potable water treatment plants.
In aggregate, 1,400 km of pipelines having different sizes & diameters and water treatment facilities having 1.6 million m3/day of total treatment capacity have been accomplished by Yüksel.
ASKI Ankara Central Wastewater Treatment Plant - being one of the largest of its kind in Europe and having the treatment capacity of 765,000 m3/day- is a constructed by Yüksel along with the prominent International Consortium Members.
Also, 133 km Eastern Province Water Transmission Line - having water transmission capacity of 500,000 m3/day - is a significant infrastructural project of Yüksel.
- Azerbaycan doğal gazını Avrupa’ya taşıyacak boru hattının toplam 1334 km uzunluğundaki ilk üç paketinden ikincisi, Yüksel’in de içinde bulunduğu SICIM (İtalya)-YUKSEL (Türkiye)-AKKORD (Azerbaycan) ortaklığı tarafından yapıldı. […]
- The plant supplies the drinking and potable water for the city of Mersin and the town of Tarsus and was constructed in 3 separate contracts, each […]
- This project is part of the Istanbul Drinking Water Phase II Project, which is the second largest project after GAP (Southeast Anatolia Project). The job included […]
- The biggest water treatment plant of Turkey, the “İvedik Water Treatment Plant” was designed to treat surface water coming from Çamlıdere and Kurtboğazı Dams with modern […]
- This project was tendered for the purpose of meeting the need of natural gas in residential and industrial regions on the Anatolian shore of Istanbul. It […]
- This turn-key project is the first sugar factory in Uzbekistan. The factory, being the first sugar factory constructed abroad with Turkey’s own know-how, is able to […]
- The project is located on the north-south line parallel to the sea shore between the cities of Jubail, Dammam and Al-Khobar, which are located in Saudi […]
- The Djizak Battery Factory Renovation Project includes the renovation of a battery factory having a construction area of 24,000 m2 as well as installation of special […]
- This project was realized by an International Consortium which consists of Yüksel İnşaat A.Ş., Brochier Gmb&abs;Co., Preussag Noell and AEG. Yüksel, on the other hand, undertook […]
- Design and construction of civil works, building works, infrastructural works, relevant electromechanical works and all lanscaping works were carried out within the scope of this contract […]
- The Almaty International Logistics Park project was constructed by the joint venture of Yüksel İnşaat and Turkuaz-YDA Construction Companies on a land area of 90,000 m2. […]
- Construction of the West Adana Wastewater Treatment Plant having a capacity of 230,000 m3/day and the East Adana Wastewater Treatment Plant having a capacity of 170,000 […]
- The works of constructing all of the units of the waste water treatment plant for the domestic and industrial waste water stemming from the enterprises located […]