King Faisal University Hospital, Phase 1 Al Hassa Infrastructure Works

The scope of work includes the following works: earthwork, rainwater systems, underground pipelines and valves, manhole and catch basin work, sidewalks, drinking water, fire protection network, fire hydrant systems, sewage system, irrigation system, CCTV, CCM & BMS systems, telecommunication systems, protection from heat and humidity, conveyor systems, pumps, cooling tower, air-conditioning installation, cooling water network, LPG system & LPG distribution network.

 

Client Ministry of Higher Education

Location Saudi Arabia

Contract Date 15 June 2010

Completion Date 30 June 2013

 

 

smaller text tool iconmedium text tool iconlarger text tool icon