Hacınınoğlu Regulator and HEPP
Print

The Hacınınoğlu Regulator and HEPP located at the lowermost downstream part of the Kandil Power Group Projects is on Ceyhan River within the Upper Ceyhan basin upstream of the Menzelet Dam in Kahramanmaraş. The regulator dam is of frontal type concrete gravity type with gated water intake. The HEPP has the installed capacity of 130 MW and annual energy generation of 360 GWh. Involving a 5500m energy tunnel construction, the Project consists of the civil works, hydromechanical equipment supply and installation.

 

Client Ere Hydroelectric Production and Trade, Inc. (ENERJİSA)

Location Kahramanmaraş / Turkey

Contract Date 01 July 2008

Completion Date 06 April 2011

 

 