The works of constructing all of the units of the waste water treatment plant for the domestic and industrial waste water stemming from the enterprises located in the Tekirdağ Velimeşe Organized Industrial Zone in accordance with the project drawings prepared considering the final capacities and operating conditions with a capacity of 150.000 m3 / day as foreseen to be constructed in the 1st phase, supply and assembly of the mechanical and electrical equipment, commissioning the plant, trial operation, maintenance, preparing the as-built projects and operation and maintenance guides and providing training for the staff of the administration.
Consortium Partner : Türkerler+YÜKSEL
Client Tekirdağ Velimeşe Organized Industrial Zone, Presidency of Enterprising
Location Turkey