Implemented in connection to Phase II of the Dubai International Airport improvement, this project includes the construction of a 630 m tunnel (on the Al Nahda highway) and a 2x3 lane 353 m. bridge (on the Beirut highway), as well as improvement and construction of two at-grade interchanges. Road signs, landscaping, street lighting, irrigation sytem, drainage systems, and tunnel safety works were also carried out within the scope of works..
Client Dubai Highway and Transportation Administration (RTA)
Location U.A.E. Dubai