The project is the construction of total 22 km of the roads – King Abdullaziz (11 km-5×2 line), Khalid Bin Walid (6 km-4×2 line) and Imam Al Shafee (5km-3×2 line) including the rainwater system, landscape, bus stops and steel bridges.
The project is the construction of total 22 km of the roads – King Abdullaziz (11 km-5×2 line), Khalid Bin Walid (6 km-4×2 line) and Imam Al Shafee (5km-3×2 line) including the rainwater system, landscape, bus stops and steel bridges.